Freddy Bensch, the "Big Kahuna", at Sweet Water Brewing Company contacted us several months ago sharing with us their troubles with having too much demand and not enough Chiller to be able to fill the demand!! We felt it was not only our job, but our duty, to help them and all beer lovers in the Southeastern Part of the United States.

We built for them a 100 HP Chiller Module that tied into their existing Glycol Storage Tank. We included some controls that enabled his older, existing, chiller system to be brought online in the event their cooling load exceeded the capacity of their new chiller system.

Sweetwater's own in-house mechanic, Frank, did a beautiful job piping in the system. Jim Jr. re-routed a trip to this region to take him through Atlanta and was able to visit the jobsite and go over the installation with them.

      

We enjoyed working with everyone at SweetWater and were happy we could in some small way help them to increase their production for all the beer lovers across the USA!


 

Check Out Our Customer Corner Archive